The Distribution Centre also houses the latest in banana and avocado ripening technology, along with world-class refrigeration systems to ensure top product quality and freshness on the shelf.
The project targeted a 5 Star Green Star rating and incorporates a 1.5 megawatt solar system, electric charging docks for trucks, drought tolerant landscape and irrigation system, double glazing, electric car charging facilities and a 155,000 litre rainwater tank.
The BESTEC design included all internal and external lighting and infrastructure systems.